Fully insuredLocal expertsLimited availability
Back to case studies

Case study

Commercial cladding clean in Filton — out-of-hours frontage reset

Local proofFilton industrial estate5 min read

A 600m² cladded façade in Filton needed a cleaner frontage without closing the site during trading hours. We surveyed it, supplied RAMS, and completed the clean over two out-of-hours nights.

Filton industrial estate cladding after an out-of-hours commercial clean

The problem

The site sat on a busy industrial estate and could not afford daytime disruption around the main entrance and loading zone. The cladding carried traffic film, rain tracking, and ingrained dullness that made the premises feel tired before visitors even signed in.

The facilities contact needed clear RAMS, sensible sequencing, and a contractor who would photograph the handback properly.

What we did

We attended for survey first, issued RAMS, and agreed an out-of-hours plan over two nights. The live clean used a hot-wash-led approach where the contamination was heavier, with waste and edge control built into the work plan. Cones, signage, and a final photographic sign-off were supplied on completion.

How we priced it

The fixed written price came to £2,850 for the two-night clean, RAMS issue, signage, and photo report. That reflected the out-of-hours timing and the size of the façade rather than just the square meterage.

The result

The client got a sharper building face, a cleaner arrival route, and a documented handback that could be shared internally. The site looked looked-after again without an awkward daytime mobilisation.

What the customer said

“We needed the building tidied up without affecting operations. The planning was clear, the team turned up as agreed, and the after-photos made internal sign-off easy.”

Mark H. · BS34

Cookie consent

Essential cookies keep the site working. Analytics and marketing cookies stay off unless you actively accept them, and you can review the cookie notice at any time.

Cookie settings